Cost of Airport Work

These numbers were taken from the DOT powerpoint presentation:

 

PROPOSED  — KAHULUI AIRPORT MASTER PLAN  —  COST ESTIMATES

 

 

 

Phase 1

Phase 2

Phase 3

 

 

Total

2015-2025

2026-2035

2035 +

 

Project

 

   

 

 

1 Runway 2-20 Extension

$15,444,000

$15,444,000

 

 

 

2 Access Road to Hana Highway (by others)

$1,600,000

 

 

$1,600,000

 

3 Aviation Lease Lot

$4,181,730

 

$4,181,730

 

 

4 Parallel Runway 8500 ft.

$62,370,000

 

 

$62,370,000

 

      Parallel Taxiway

$50,490,000

 

 

$50,490,000

 

5 South Ramp Projects (grade and pave)

$625,500

$625,500

 

 

 

6 Helicopter Facility Expand (Grade and Pave)

$30,000

 

$30,000

 

 

7 New Central RAC (by others)

$178,000,000

 

 

 

 

8 Haleakala (to be closed)

$1,200,000

$1,200,000

 

 

 

9 Keolani Lease Lots (Clear and Grade)

$555,000

$555,000

 

 

 

10 Realign Hana Highway (Grade and Pave)

$2,310,000

 

 

$2,310,000

 

11 5-23 Taxiway Realignment (Twy B, F, and G)

$11,745,000

$11,745,000

 

 

 

12 New Gates North-end

$163,348,750

 

$163,348,750

 

 

13 Terminal Holdrooms -South

$43,559,665

 

$43,559,665

 

 

14 Transient Aircraft Parking

$11,173,054

 

 

$11,173,054

 

 15 Alahao Emergency Access Road

$950,400

 

$950,400

 

 

16 Access Road to Beach

$475,200

$475,200

 

 

 

17 East Ramp Access Road

$3,240,000

 

 

$3,240,000

 

17a East Ramp Access Road Tunnel

$900,000

 

 

 

 

18 Relocate Commuter Terminal

$5,000,000

 

$5,000,000

 

 

    18A Relocated Commuter Parking

$784,080

 

$784,080

 

 

    18B Relocated Commuter Apron

$5,292,500

 

$5,292,500

 

 

19 GA T-Hangars

$4,800,000

 

 

$4,800,000

 

20 Central 2nd Level Access

$7,500,000

 

$7,500,000

 

 

21 Terminal 2nd Level Improvements

$1,000,000

 

$1,000,000

 

 

22 Rwy 5 Extension 1250 ft.

$14,850,000

$14,850,000

 

 

 

23 Rwy 23 Extension 750 ft.

$2,970,000

$2,970,000

 

 

 

24 Land to be acquired

$12,981,759

$12,981,759

 

 

 

25 Realign Lanui Circle

$560,000

$560,000

 

 

 

26 Expand Cargo -East Ramp

$4,116,420

 

 

$4,116,420

 

27 South Ramp Apron

$31,755,240

 

$31,755,240

 

 

28 Terminal Expansion to South

$174,238,650.00

 

$174,238,650.00

 

 

SUBTOTAL

$818,046,947

$61,406,459

$437,641,015

$140,099,474

 

 Design @ 8%

$65,443,756

$4,912,517

$35,011,281

$11,207,958

 

 Subtotal

$883,490,703

$66,318,976

$472,652,296

$151,307,431

 

 

 

 

 

 

 

Contingency 15%

$132,523,605

$9,947,846

$70,897,844

$22,696,115

 

 TOTAL

$1,016,014,308

$76,266,822

$543,550,140

$174,003,546

 

 

 

 

 

 

 
           

This table grossly underestimates the true costs.  It includes only NEW CIP and does not include maintenance and repair of the existing facilities or of the new facilities.